"...The project was developed and Initiated on time; the various phases of the project were accomplised with impressive coordination demonstrating notable technical knowledge and expertise in the construction field... This successful effort ensured a cost conscious discipline through the project to conclude within budget and on time..."
Tony Angelino
VicePresident
CUPID FOUNDATION

McDonalds Reference

"...We wish to emphasize that Mr. Ahlers received with enthusiasm all the recommendations and training in the different areas from the construction of restaurants, which were as much carried out in Nicaragua as in Costa Rica; process necessary and indispensable to reach the quality level that requires a company with the standards of the McDonald's restaurants worldwide..."
Andy Dinger
Construction Supervisor
McDonald's Central America

Current Projects


 

Isla Saboga

Project Briefing: Isla Saboga – COPERCO was hired to build the first phase of this U$220M project which consists of developing the island of Saboga. The first phase consists of the initial infrastructure including the electricity, water, and roads, along with the first eleven high-end beach-front homes.
Link: Official Project Link
Coperco Blank Project Pictures 1 2 3 4 5 6
Amayo Wind Farm

Project Briefing: COPERCO was hired by SUZLON for the civil construction of the second phase of Amayo Wind Farm in Rivas, Nicaragua. This second phase consists of 11 towers that will produce 23.1 MW of clean energy. This is an expansion to the first phase of 19 towers for which COPERCO built the civil works. This is the first large scale wind farm in Nicaragua and the largest of its kind in Central America. The civil works required the processing of 13,000 m3 of concrete along with 1,300 tons of steel, while creating over 7 kilometers of access roads and underground electrical and optical cables. Construction time of the first phase was eight months while the second phase will be five months.
Link: Official Project Link
Coperco.- Blank Project Pictures 1 2 3 4 5 6 7 8 9 10
Milagro del Mar

Project Briefing: COPERCO was hired to build the first phase of this U$44M project which consists of a high end beach & golf tourism complex on the Pacific Coast of Nicaragua. The first phase includes a 44 condominium five-story building facing the ocean, along with two pools, a restaurant and a waterfall leading from the building towards the ocean.
Link: Official Project Link
Coperco.- Blank Project Pictures 1 2 3 4 5 6 7 8 9
Accedo Technologies

Project Briefing: COPERCO was hired to build this technological park along with its first contact center or call center that will house up to six hundred people who will be serving as an outsourced back-office in Nicaragua for foreign companies.
Link: Official Project Link
Coperco Blank Visit Our Project Gallery
Free Zone Las Palmeras

Project Briefing: COPERCO was hired to design-build the fourth building at this industrial free zone that already provides 2,000 jobs to the region of Masaya and Carazo in Nicaragua. With this 10,500 m2 industrial building, another 1,000 jobs will be created. Design and construction will be 8 months.
Link: Official Project Link
Coperco.- Blank Project Pictures 1 2 3
Clic This Image to visit the Official Biwater - Waste Water Treatment Plant for Managua, Nicaragua

Project Briefing: COPERCO was hired by BIWATER Ltd. (www.biwater.com) for the civil construction of the City of Managua's Waste Water Treatment Plant.

This plant will process 50,000 gpm prior to discharging clean water to the Lake of Managua.The plant requires us to place 2,000 tons of steel, 15,000 m3 of concrete, and use both SYMONS gang-formed flexible steel formwork as well as SYMONS gang-formed steel-ply formwork. The plant includes three buildings, six 114' DIA x 20' tall round tanks, four 75' x 30' ft tall round tanks, seventeen 80' x 30' x 20' rectangular tanks, as well as several other structures. Our construction time will be 16 months.
Link: Official Project Link
Project Pictures 1 2
Aarsleff Water Pumping Station

Project Briefing: COPERCO was hired by Per Aarsleff to build the six waste water pumping stations that will carry this product to Managua´s Waste Water Treatment Plant.
Link: Official Project Link
Coperco.- Blank Project Pictures 1
Café Soluble

Project Briefing: COPERCO was hired to build a 35,000 ft2, 8 inch thick, industrial floor slab. The slab was built using high density polyethylene fiber reinforcement as well as rectangular and square dowels. This slab was designed to resist heavily loaded forklifts with small, solid wheels.
Link: Official Project Link
Project Pictures 1 2

Facts of Interest


Full Service Construction

Highlight Image

We specialize in full service construction for individuals and corporations that wish to build in Nicaragua. Read More...


Quality and Reliability

Highlight Image

Our company philosophy is to provide quality and reliable construction services you can depend on. Read More...


Wether you Build...

Highlight Image

A tourism complex, a free zone, an industrial building, a factory, a commercial building, a water treatment plant, a high end real estate development or a low cost housing project. Read More...


Highest Caliber

Highlight Image
Our goal is to provide you with courteous, expedient, professional service of the highest caliber. Read More...

Spread the Word!

Share this page
del.icio.us Digg.com Facebook Google Myspace StumbleUpon Twitter